← All case studies
Case study · Cutover

Documented cutover to full Farrox operations

Several companies already run Farrox in production — including large operations such as Autoteilemarkt with full daily business on the platform. This case study documents a concrete hard cutover: after roughly 20 years on industry software, the operation switched fully to Farrox in a single day — no parallel run, no rollback.

FARROX AI vehicle intake at Lechmann

At a glance

  • Operation: Lechmann oHG / Autoteilemarkt.de — vehicle recycling & used parts
  • Team: about 15 staff use FARROX AI every day
  • Starting point: ~20 years on industry software
  • Cutover: full switch in one day — legacy system turned off
  • Core outcome: vehicle/parts intake typically under a minute; direct eBay API

Challenge

Lechmann is an established vehicle recycler and eBay-active used-parts dealer. For two decades the business ran on a classic industry solution. Familiarity made change feel risky. Typical bottlenecks: slow vehicle and parts intake, too many clicks, and cost/dependency on external eBay connectors.

Cutover

Instead of 6–12 months of parallel operation, the business chose a hard cut: the legacy system was fully shut down. The next morning, operations ran exclusively on FARROX AI. There was no rollback. The business kept running. Staff have preferred the new system since day one.

Outcomes

  • Vehicle and parts intake typically under a minute instead of multi-minute typing
  • Direct eBay API — without an expensive third-party eBay connector as the default path
  • Noticeably faster online selling in daily operations (including a clear lift in daily eBay sales after go-live)
  • One system for intake, warehouse, sales, and accounting-adjacent workflows

Reference call on request via FARROX AI ( / ).

Shop & Technologie-Erläuterungen: autoteilemarkt.de · Technologie / Farrox.

Ready to see Farrox in action?

Request a personal demo — we will show the platform in real production use.

Request a demo